Sensing period end is before sensing period start, Sentinel 2

Hi,

I’m writing my thesis right now and using SNAP for processing Sentinel 1 and Sentinel 2 products. As I was inspecting the name of the Sentinel 2 product, I found something really strange. Namely that the end of the sensing period is before the start of the sensing period.
The name of the product is as following:

S2A_OPER_PRD_MSIL1C_PDMC_20160816T203606_R135_V20160815T074942_20160815T074941.SAFE

As you can see in the name convention (https://sentinel.esa.int/web/sentinel/user-guides/sentinel-2-msi/naming-convention) the starting period is the first and the ending period is the last time indication.
Start: 20160815T074942
End: 20160815T074941

Has someone any idea why? This is not logical. Maybe something went wrong during downloading?

Thanks in advance,

menisevrem

Hi,

did you ever get any answer on this matter?

Adrian