where it is suggested to remove the space in “ESD Measurement” in the DIM file, this at least opens the progress bar, but it becomes stuck on 0% - no .bin files are generated, and only the config and metadata files are created after 12 hours. Furthermore, SNAP appears not to be processing anything, as CPU and RAM usage are low.
EDIT: tried the processing a single IW and subsetting, and it worked. This confirms that SNAP has issues with exporting PolSAR Pro after merging multiple IWs.
Could you try to separate the graph into two sub-graphs with the first graph does not include Terrain Correction while the second graph includes Terrain Correction? This is because the terrain corrected image is not in the SAR image domain and to process it in a graph may introduce a lot of redundant calculations for other operators and also causes memory issue. To run two separated graphs should improve the performance.