Hi all,
I am doing my first steps in SAR interferometry. In this context, I am trying to obtain an interferogram from the last Ishinomaki (Japan) earthquake.
For this purpose I am using three overlaping SLC IW images of two different dates:
October 21st, 2016:
S1A_IW_SLC__1SSV_20161021T204150_20161021T204217_013593_015C54_0029
S1A_IW_SLC__1SSV_20161021T204215_20161021T204242_013593_015C54_8652
S1A_IW_SLC__1SSV_20161021T204239_20161021T204306_013593_015C54_D4AF
November 14th, 2016
S1A_IW_SLC__1SSV_20161114T204150_20161114T204217_013943_01673B_EC0F
S1A_IW_SLC__1SSV_20161114T204214_20161114T204241_013943_01673B_960F
S1A_IW_SLC__1SSV_20161114T204239_20161114T204306_013943_01673B_EF81
I am using this graph to process it:
I am a bit lost about if my graph has any sense or not (this graph based on the TOPSAR graphs included in SNAP after reading/viewing all the ESA tutorials online).
The main issue is that this graph is running since 5 days ago in an i7/64 gb/SSD/GTX 980 ti machine. Some hours ago after launching the execution the progress bar was at 8% and after that the progress is 1% per processing day. It is taking too long!!!
Do you see any issue in my graph or can you show me a better way to use two SLC IW overlapping product sets? Regarding the product used, I just found IW SLC for this place and dates.
Thank you in advance,
Javier